Who is responsible for Construction Phase Review 'As-Built' Record?

Explanation:
During construction, the as-built record reflects what was actually installed, including drawings, equipment lists, and field changes. The party that builds supplies the documentation, while the commissioning authority independently reviews and verifies that those records accurately reflect the installed systems, test results, and operational data. This review happens as part of the Construction Phase to ensure the documentation is complete and ready for handover and future operations. Because both documenting the actual work and verifying its accuracy are essential, this becomes a shared responsibility between the contractor and the commissioning authority.

During construction, the as-built record reflects what was actually installed, including drawings, equipment lists, and field changes. The party that builds supplies the documentation, while the commissioning authority independently reviews and verifies that those records accurately reflect the installed systems, test results, and operational data. This review happens as part of the Construction Phase to ensure the documentation is complete and ready for handover and future operations. Because both documenting the actual work and verifying its accuracy are essential, this becomes a shared responsibility between the contractor and the commissioning authority.

Subscribe

Get the latest from Passetra

You can unsubscribe at any time. Read our privacy policy